Services & Products
Data Solutions
Telsol is a premier integrator of enterprise access for data management, systems, developing, deploying, and servicing productivity solutions.
We are providing the latest network access solutions in the field of telecommunication voice and data networks. We have emerged a prominent provider of reliable and cost-effective telecommunication.
The Fiber-to-the-home (FTTH) and the Fiber-to-the-office (FTTO), both involves the installation of a direct Fiber Optic connection to the residence. They will also efficiently enable an advanced converged communication technologies, including multiple channels of high definition television and full video. In addition to all that, they will aid as well in entering new applications like VOIP and IPTV to the house and the office.
OSP: Outside Plant Of telecommunications Cables
Telsol is one of the most specialized companies in Middle East and Africa working in the field of Fiber Optic Cables and Copper Cables as complete turn-key projects.
It covers the following:
- Surveying and engineering.
- Project management.
- Design and drawing.
- Civil work (Trenching).
- Installation (pulling, blowing, laying).
- Fusion Splicing and Termination.
- Testing.
References:
|
Customers - Oil & Gas |
- ABB Automation
- Agiba Oil Company
- Alcatel – ISD Italy
- EMC
- Enppi
- Gasco
- Honey Well UAE
- Invensys Italy
- KBR Algeria
- Khalda Petroleum Company
- Pabetco
- Petrojet
- Qarun Petroleum Company { Apache – EGPC }
- Schneider Automation
- Siemens
- UGD (BP - Gasco)
- Yokogawa
|
|
Customers - Electricity |
- ABB – HV Egypt
- ABB Utilities Germany
- Arab Contractor Egypt
- Areva France
- Cegelec Egypt
- Initec Spain
- KEC india
- National Electricity Corporation
- Nexans Cables France
- Pirelli Systems Spain
- Schneider Egypt
- Siemens
|
|
Customers - Telecommunications |
- Al Hanoo Contracting Co.
- Al Rawabet Contracting Co.
- Al Wahat Telecom Company – Libya
- Alcatel – Italy
- Alcatel Cables France
- Canar Telecommunication Company
- Huawei Saudi Arabia
- Marias France
- Orascom Telecom Algeria
|
|
Customers - Others |
- ABB Rwanda
- ASEC Automation
- Cegelec
- Civil Aviation Egypt
- Siemens Belgium
- DMSE
- Ericsson
- National Air Navigation
- Nile Aster Egypt
- Orascom Construction Industries
- TAV Turkey
- Thales France
|
Projects:
Projects - Oil & Gas
|
Dabaa Oil Company Egypt |
|
Project: |
Dabaa Pipeline |
|
Country: |
Egypt |
|
Scope Of Work: |
Supply, Laying, Splicing and Testing of 30 km of 12 F armored cable |
|
|
|
Year: |
2007 |
|
Petrojet Algeria |
|
Project: |
Houd Al Hamra Pipeline |
|
Country: |
Algeria |
|
Scope Of Work: |
Laying supervision, splicing, testing and hand over to sonatrach of 770 km of 24 SM armored Fiber. Direct buried. |
|
|
|
Year: |
2007 |
|
EMC Egypt |
|
Project: |
Bapetco Network |
|
Country: |
Egypt |
|
Scope Of Work: |
Preventive Maintenance and call off agreement for the PABETCO FOC network |
|
|
|
Year: |
2006 |
|
Petrojet Egypt |
|
Project: |
Neem Difra Pipeline |
|
Country: |
Sudan |
|
Scope Of Work: |
Installation, Splicing, Testing and Termination of 100 Km of 36 SM Fiber Armoured Cable. |
|
|
|
Year: |
2006 |
|
Petrojet Egypt |
|
Project: |
MidTap Adminstration Building |
|
Country: |
Egypt |
|
Scope Of Work: |
Supply, installation, commissions and maintenance of the data system for 500 user |
|
|
|
Year: |
2006 |
|
Alcatel – ISD Italy |
|
Project: |
WAGP Project |
|
Country: |
Libya |
|
Scope Of Work: |
Splicing, Testing and Termination of 24 Fiber Armoured Cable. |
|
|
|
Year: |
2005 |
|
Enppi Egypt |
|
Project: |
Midor Telecom Network |
|
Country: |
Egypt |
|
Scope Of Work: |
Trouble shooting and repair of Midor Refinery FOC network approx. 50 km of 6 F SM Cable |
|
|
|
Year: |
2005 |
|
Gasco |
|
Project: |
Alexandria Network |
|
Country: |
Egypt |
|
Scope Of Work: |
Supply of 3000 M MM50/125 armored cable, connector and converters. |
|
|
|
Year: |
2005 |
|
Gasco Egypt |
|
Project: |
GASCO Building Alexandria |
|
Country: |
Egypt |
|
Scope Of Work: |
Supply of 3 Km of MM 8 Fibers armoured cable with accessories. |
|
|
|
Year: |
2005 |
|
KBR Algeria |
|
Project: |
Insalah Gas Project |
|
Country: |
Algeria |
|
Scope Of Work: |
Supply and installation of 1200 Meter Of 6 Fiber armored LSZH Cable. |
|
|
|
Year: |
2005 |
|
Pirelli Systems Spain |
|
Project: |
ADNOC |
|
Country: |
UAE |
|
Scope Of Work: |
Testing, Splicing and Termination of 32 Fiber SM Fiber |
|
|
|
Year: |
2005 |
|
Qarun Petroleum Company { Apache – EGPC } |
|
Project: |
Karma Oil Field Development |
|
Country: |
Egypt |
|
Scope Of Work: |
Supply, Installation, Splicing, Termination and Testing of 32000 M of 12 Fiber SM Armoured Cable. |
|
|
|
Year: |
2005 |
|
Yokogawa Egypt |
|
Project: |
Fajr Gas Pipeline |
|
Country: |
Jordan |
|
Scope Of Work: |
Laying , Testing, Splicing and Termination of 12 SM armored Cable 470 km |
|
|
|
Year: |
2005 |
|
Alcatel Cables France |
|
Project: |
Sharara – Mellita pipeline |
|
Country: |
Libya |
|
Scope Of Work: |
Installation in direct burial with pipeline, testing, splicing and termination and accessories supplies for 800 KM of 12 Fiber SM armored cable. |
|
|
|
Year: |
2004 |
|
Giza Systems |
|
Project: |
Spanish Egyptian Gas [EGAS] |
|
Country: |
Egypt |
|
Scope Of Work: |
Testing, Splicing and Termination of MM and SM Fiber Optic network for the SCADA system |
|
|
|
Year: |
2004 |
|
Pabetco Egypt |
|
Project: |
Aboyed Field |
|
Country: |
Egypt |
|
Scope Of Work: |
Repair and maintenance of 80 km Fiber Optic cables in Aboyed Oil fields [9 wells] |
|
|
|
Year: |
2004 |
|
Pirelli Systems Spain |
|
Project: |
OKPAI POWER PLANT |
|
Country: |
Nigeria |
|
Scope Of Work: |
Testing, Splicing and Termination of 64 km OPGW 24 SM Fiber. |
|
|
|
Year: |
2004 |
|
Schneider Egypt |
|
Project: |
Sienna Oil Field |
|
Country: |
Egypt |
|
Scope Of Work: |
Supply, Installation of 3000 Meter of 4 Fiber MM armoured cable with accessories. |
|
|
|
Year: |
2004 |
|
Siemens Egypt |
|
Project: |
UGDC CCTV System |
|
Country: |
Egypt |
|
Scope Of Work: |
Supply, termination and testing of 7000 M 4F MM armoured cable LS0Hwith all necessary accessories. Port Said Terminal.. |
|
|
|
Year: |
2004 |
|
Siemens Egypt |
|
Project: |
UGDC CCTV System |
|
Country: |
Egypt |
|
Scope Of Work: |
Supply, termination and testing of 3500 M 4F MM armoured cable LS0Hwith all necessary accessories. Damitta Terminal. |
|
|
|
Year: |
2004 |
|
Agiba Oil Company |
|
Project: |
Mileha –Hamra Pipeline |
|
Country: |
Egypt |
|
Scope Of Work: |
Repair and maintenance of 180 km Fiber Optic cables between Meliha and Hamra oil fields |
|
|
|
Year: |
2003 |
|
Honey Well UAE |
|
Project: |
Summed Pipeline Project |
|
Country: |
Egypt |
|
Scope Of Work: |
Supply, installation [Direct Burial], splicing and testing of the complete fiber link (3000 Meter) of 6 Fiber – MM – Armored Type. |
|
|
|
Year: |
2003 |
|
Invensys Italy |
|
Project: |
Oriental Gas Pipeline Egypt – Jordan |
|
Country: |
Egypt |
|
Scope Of Work: |
Installation Conduit Installation], Splicing and testing of 260000 Meter – 12 Fiber SM – Steel Tape armored. |
|
|
|
Year: |
2003 |
|
Khalda Petroleum Company Egypt |
|
Project: |
Oil Fields Development |
|
Country: |
Egypt |
|
Scope Of Work: |
Supply of 2200 Meter – 8 Fiber and 4500 Meter 4 Fiber – SM – armored Type |
|
|
|
Year: |
2003 |
|
Schneider Electric Egypt |
|
Project: |
UGDC SCADA System |
|
Country: |
Egypt |
|
Scope Of Work: |
Supply, termination and testing of 1200 M 8F MM armoured cable with accessories. |
|
|
|
Year: |
2003 |
|
UGD (BP - Gasco) Egypt |
|
Project: |
Propane Pipeline Damitta – Port Said |
|
Country: |
Egypt |
|
Scope Of Work: |
Supply, splicing, testing and installation [Direct Burial and conduit] supervision of 120000 Meter - 12 Fiber – SM – Steel wire armored cable |
|
|
|
Year: |
2003 |
|
Khalda Petroleum Company Egypt |
|
Project: |
Tarek Oil Field |
|
Country: |
Egypt |
|
Scope Of Work: |
Supply of 20000 Meter – 4 Fiber – SM armored cable. |
|
|
|
Year: |
2002 |
|
Khalda Petroleum Company Egypt |
|
Project: |
Tarek Oil Field |
|
Country: |
Egypt |
|
Scope Of Work: |
Supply of 200 ST hot melt connectors and adapter. |
|
|
|
Year: |
2002 |