Products Catalogue 

Services & Products

 

Data Solutions

Telsol is a premier integrator of enterprise access for data management, systems, developing, deploying, and servicing productivity solutions.

We are providing the latest network access solutions in the field of telecommunication voice and data networks. We have emerged a prominent provider of reliable and cost-effective telecommunication.

The Fiber-to-the-home (FTTH) and the Fiber-to-the-office (FTTO), both involves the installation of a direct Fiber Optic connection to the residence. They will also efficiently enable an advanced converged communication technologies, including multiple channels of high definition television and full video. In addition to all that, they will aid as well in entering new applications like VOIP and IPTV to the house and the office.

 

OSP: Outside Plant Of telecommunications Cables

 

Telsol is one of the most specialized companies in Middle East and Africa working in the field of Fiber Optic Cables and Copper Cables as complete turn-key projects.


It covers the following:

- Surveying and engineering.
- Project management.
- Design and drawing.
- Civil work (Trenching).
- Installation (pulling, blowing, laying).
- Fusion Splicing and Termination.
- Testing.


 

References:

 

Customers - Oil & Gas

    • ABB Automation
    • Agiba Oil Company
    • Alcatel – ISD Italy
    • EMC
    • Enppi
    • Gasco
    • Honey Well UAE
    • Invensys Italy
    • KBR Algeria
    • Khalda Petroleum Company
    • Pabetco
    • Petrojet
    • Qarun Petroleum Company { Apache – EGPC }
    • Schneider Automation
    • Siemens
    • UGD (BP - Gasco)
    • Yokogawa

 

 

 

 

 

 

 

 

 

 

 

 

 

Customers - Electricity

    • ABB – HV Egypt
    • ABB Utilities Germany
    • Arab Contractor Egypt
    • Areva France
    • Cegelec Egypt
    • Initec Spain
    • KEC india
    • National Electricity Corporation
    • Nexans Cables France
    • Pirelli Systems Spain
    • Schneider Egypt
    • Siemens

 

 

 

 

 

 

 

 

 

   

Customers - Telecommunications

    • Al Hanoo Contracting Co.
    • Al Rawabet Contracting Co.
    • Al Wahat Telecom Company – Libya
    • Alcatel – Italy
    • Alcatel Cables France
    • Canar Telecommunication Company
    • Huawei Saudi Arabia
    • Marias France
    • Orascom Telecom Algeria

 

 

 

 

 

 

 

 

Customers - Others

    • ABB Rwanda
    • ASEC Automation
    • Cegelec
    • Civil Aviation Egypt
    • Siemens Belgium
    • DMSE
    • Ericsson
    • National Air Navigation
    • Nile Aster Egypt
    • Orascom Construction Industries
    • TAV Turkey
    • Thales France

 

 

 

 

 

 

 

 

 

 

 

Projects:

Projects - Oil & Gas

 

Dabaa Oil Company Egypt

Project:

Dabaa Pipeline

Country:

Egypt

Scope Of Work:

Supply, Laying, Splicing and Testing of 30 km of 12 F armored cable

Year:

2007

 

Petrojet Algeria

Project:

Houd Al Hamra Pipeline

Country:

Algeria

Scope Of Work:

Laying supervision, splicing, testing and hand over to sonatrach of 770 km of 24 SM armored Fiber. Direct buried.

Year:

2007

 

EMC Egypt

Project:

Bapetco Network

Country:

Egypt

Scope Of Work:

Preventive Maintenance and call off agreement for the PABETCO FOC network

Year:

2006

 

Petrojet Egypt

Project:

Neem Difra Pipeline

Country:

Sudan

Scope Of Work:

Installation, Splicing, Testing and Termination of 100 Km of 36 SM Fiber Armoured Cable.

Year:

2006

 

Petrojet Egypt

Project:

 MidTap Adminstration Building

Country:

Egypt

Scope Of Work:

Supply, installation, commissions and maintenance of the data system for 500 user

Year:

2006

 

Alcatel – ISD Italy

Project:

WAGP Project

Country:

Libya

Scope Of Work:

Splicing, Testing and Termination of 24 Fiber Armoured Cable.

Year:

2005

 

Enppi Egypt

Project:

Midor Telecom Network

Country:

Egypt

Scope Of Work:

Trouble shooting and repair of Midor Refinery FOC network approx. 50 km of 6 F SM Cable

Year:

2005

 

Gasco

Project:

Alexandria Network

Country:

Egypt

Scope Of Work:

Supply of 3000 M MM50/125 armored cable, connector and converters.

Year:

2005

 

Gasco Egypt

Project:

GASCO Building Alexandria

Country:

Egypt

Scope Of Work:

Supply of 3 Km of MM 8 Fibers armoured cable with accessories.

Year:

2005

 

KBR Algeria

Project:

Insalah Gas Project

Country:

Algeria

Scope Of Work:

Supply and installation of 1200 Meter Of 6 Fiber armored LSZH Cable.

Year:

2005

 

Pirelli Systems Spain

Project:

ADNOC

Country:

UAE

Scope Of Work:

Testing, Splicing and Termination of 32 Fiber SM Fiber

Year:

2005

 

Qarun Petroleum Company { Apache – EGPC }

Project:

Karma Oil Field Development

Country:

Egypt

Scope Of Work:

Supply, Installation, Splicing, Termination and Testing of 32000 M of 12 Fiber SM Armoured Cable.

Year:

2005

 

Yokogawa Egypt

Project:

Fajr Gas Pipeline

Country:

Jordan

Scope Of Work:

Laying , Testing, Splicing and Termination of 12 SM armored Cable 470 km

Year:

2005

 

Alcatel Cables France

Project:

Sharara – Mellita pipeline

Country:

Libya

Scope Of Work:

Installation in direct burial with pipeline, testing, splicing and termination and accessories supplies for 800 KM of 12 Fiber SM armored cable.

Year:

2004

 

Giza Systems

Project:

Spanish Egyptian Gas [EGAS]

Country:

Egypt

Scope Of Work:

Testing, Splicing and Termination of MM and SM Fiber Optic network for the SCADA system

Year:

2004

 

Pabetco Egypt

Project:

Aboyed Field

Country:

Egypt

Scope Of Work:

Repair and maintenance of 80 km Fiber Optic cables in Aboyed Oil fields [9 wells]

Year:

2004

 

Pirelli Systems Spain

Project:

OKPAI POWER PLANT

Country:

Nigeria

Scope Of Work:

Testing, Splicing and Termination  of 64 km OPGW 24 SM Fiber.

Year:

2004

 

Schneider Egypt

Project:

Sienna Oil Field

Country:

Egypt

Scope Of Work:

Supply, Installation of 3000 Meter of 4 Fiber MM armoured cable with accessories.

Year:

2004

 

Siemens Egypt

Project:

UGDC CCTV System

Country:

Egypt

Scope Of Work:

Supply, termination and testing of 7000 M 4F MM armoured cable LS0Hwith all necessary accessories. Port Said Terminal..

Year:

2004

 

Siemens Egypt

Project:

UGDC CCTV System

Country:

Egypt

Scope Of Work:

Supply, termination and testing of 3500 M 4F MM armoured cable LS0Hwith all necessary accessories. Damitta Terminal.

Year:

2004

 

Agiba Oil Company

Project:

Mileha –Hamra Pipeline

Country:

Egypt

Scope Of Work:

Repair and maintenance of 180 km Fiber Optic cables between Meliha and Hamra oil fields

Year:

2003

 

Honey Well UAE

Project:

Summed Pipeline Project

Country:

Egypt

Scope Of Work:

Supply, installation [Direct Burial], splicing and testing of the complete fiber link (3000 Meter) of 6 Fiber – MM – Armored Type.

Year:

2003

 

Invensys Italy

Project:

Oriental Gas Pipeline Egypt – Jordan

Country:

Egypt

Scope Of Work:

Installation Conduit Installation], Splicing and testing of 260000 Meter – 12 Fiber SM – Steel Tape armored.

Year:

2003

 

Khalda Petroleum Company Egypt

Project:

Oil Fields Development

Country:

Egypt

Scope Of Work:

Supply of 2200 Meter – 8 Fiber and 4500 Meter 4 Fiber – SM – armored Type

Year:

2003

 

Schneider Electric Egypt

Project:

UGDC SCADA System

Country:

Egypt

Scope Of Work:

Supply, termination and testing of 1200 M 8F MM armoured cable with accessories.

Year:

2003

 

UGD (BP -  Gasco) Egypt

Project:

Propane Pipeline Damitta – Port Said

Country:

Egypt

Scope Of Work:

Supply, splicing, testing and installation [Direct Burial and conduit] supervision of 120000 Meter - 12 Fiber – SM – Steel wire armored cable

Year:

2003

 

Khalda Petroleum Company Egypt

Project:

Tarek Oil Field

Country:

Egypt

Scope Of Work:

Supply of 20000 Meter – 4 Fiber – SM armored cable.

Year:

2002

 

Khalda Petroleum Company Egypt

Project:

Tarek Oil Field

Country:

Egypt

Scope Of Work:

Supply of 200 ST hot melt connectors and adapter.

Year:

2002

< Back Top ^